Meridian Water Capacity Enhancements for WSP

WSP engaged Prime Engineering to support the delivery of GRIP3 and GRIP4 signalling design deliverables for the Meridian Water Capacity Enhancements project. The deliverables played a key role in the project achieving Preliminary Approval in GRIP3 and Approval In Principle in GRIP4.

WSP engaged Prime Engineering to support the delivery of GRIP3 and GRIP4 signalling design deliverables for the Meridian Water Capacity Enhancements project. The deliverables played a key role in the project achieving Preliminary Approval in GRIP3 and Approval In Principle in GRIP4.

The objective of this project was to introduce a new loop line and platform at Ponders End station in order to increase train frequencies. This would provide an incentive to future housing development around the area and will benefit the wider route of the West Anglian main line.

The alterations required to fulfil the operational aspirations of the project include extensive modifications to an existing SSI interlocking which currently controls the affected area. We provided the specialist SSI expertise to develop the most practical and efficient solutions for this complex engineering project.

Prime Rail Engineering Ltd provided an agile design and independent verification service to help WSP to successfully deliver the following signalling design reports:

  • GRIP3 Signalling Design Specification
  • GRIP3 Alarms Strategy Report
  • GRIP4 Interlocking Control Requirements Specification
  • GRIP4 Interlocking Data Development Plan

Let’s work on your next project together

Our engineers’ thorough knowledge of Railway Group, Rail Industry, Network Rail company standards and industry best practice will help us to safely deliver your signalling projects.

Get in touch

If you have any questions or queries, we will always be happy to help. Please get in touch with us via the adjacent form or through the following contacts:

Contact form